Using an existing asset
When a GLB, USDZ or CAD file exists, production cost is zero. Optimization, format conversion and integration are handled on our side.
- Cost: lowest
- Timeline: 1–3 days
- Effort: on the brand
- Quality depends on existing model
Production
There are three production paths; the fit depends on product type. Timeline, cost level and where the effort sits are listed below.

Three paths
When a GLB, USDZ or CAD file exists, production cost is zero. Optimization, format conversion and integration are handled on our side.
Modeling from photos and measurements. The safest route for complex geometry, transparent/glossy surfaces, and fabric.
AI generates a base model from photos; topology, dimensions and texture are then corrected by a modeler.
Comparison
Exact pricing depends on product complexity; the level indicator below gives direction.
| A · Existing | B · Custom | C · Hybrid | |
|---|---|---|---|
| Product type | Simple geometry | Complex / luxury | Whole catalog |
| Approx. time / product | 1–3 days | 5–10 days | 2–4 days |
| Cost level | ₺ | ₺₺₺ | ₺₺ |
| Dimensional accuracy | Depends on existing model | Exact match | Exact match (after review) |
| Hundreds of SKUs | Feasible | Difficult | Best fit |
Quality control
In hybrid production, every model passes the same checklist.