Production

Cost collects in asset production

There are three production paths; the fit depends on product type. Timeline, cost level and where the effort sits are listed below.

Production example — tote bag 3D model

Three paths

Existing, custom, hybrid

A

Using an existing asset

When a GLB, USDZ or CAD file exists, production cost is zero. Optimization, format conversion and integration are handled on our side.

  • Cost: lowest
  • Timeline: 1–3 days
  • Effort: on the brand
  • Quality depends on existing model
B

Production from scratch

Modeling from photos and measurements. The safest route for complex geometry, transparent/glossy surfaces, and fabric.

  • Cost: medium-high
  • Timeline: 5–10 days
  • Effort: on the studio
  • Quality: full control
C

AI-assisted hybrid production

AI generates a base model from photos; topology, dimensions and texture are then corrected by a modeler.

  • Cost: medium-low
  • Timeline: 2–4 days
  • Effort: shared
  • Quality: store-ready after human touch-up

Comparison

Which path for which product

Exact pricing depends on product complexity; the level indicator below gives direction.

A · ExistingB · CustomC · Hybrid
Product typeSimple geometryComplex / luxuryWhole catalog
Approx. time / product1–3 days5–10 days2–4 days
Cost level₺₺₺₺₺₺
Dimensional accuracyDepends on existing modelExact matchExact match (after review)
Hundreds of SKUsFeasibleDifficultBest fit

Quality control

AI output doesn't go live as-is

In hybrid production, every model passes the same checklist.

  1. 01Size and proportion check (compared against the real product's measurements)
  2. 02Topology and polygon budget (target file size for mobile)
  3. 03Texture / material accuracy — matched against color reference
  4. 04Real-world scale and ground-placement test in AR
  5. 05Viewing test on iOS and Android devices